Pokfulam Slope Improvement project photos

薄扶林斜坡改善項目圖片

BACK TO HOME 回主頁

Slopework at Pokfulam Road 薄扶林道斜坡工程

The Works to be carried out under this Contract typically includes the provision of all supervision, labour, materials, plants, tools and everything required for the satisfactory execution of the slope stabilization and upgrading works at Bethanie, 139 Pokfulam Road. The slope stabilization and upgrading works consist of the installation of permanent soil nails and the associated pull-out tests and performance tests; construction, repair, relocation and improvement of surface and sub-surface drainage system; slope excavation and trimming works; construction of concrete wall; stone pitching surface, hydroseeding the slope surface with erosion control mat together with the wire mesh; slope surfacing and landscaping works; settlement points monitoring. Contract sum is about HK$ 12 million.

薄扶林道139號斜坡工程包括安裝永久泥釘及進行有關拉力及評估測試;興建、維修、重整位置及改善地面排水系統;斜坡挖掘及整理工作;興建混凝土牆、鋪石地、噴草防護及覆上一層防止土壤侵蝕的保護膜,工程合約價約為港幣1仟2佰萬元。

薄扶林道139号斜坡工程包括安装永久泥钉及进行有关拉力及评估测试;兴建、维修、重整位置及改善地面排水系统;斜坡挖掘及整理工作;兴建混凝土墙、铺石地、喷草防护及覆上一层防止土壤侵蚀的保护膜,工程合约价约为港币1仟2佰万元。

BACK TO HOME 回主頁